1) Regeneration fuel: a combination of hydrogen and inert fuel (hydrogen accounts for 5% -10%)
2) Quantity: 40L fuel cylinder 10Mpa
3) Regenerative gas tension: .05Mpa (the gas consumption for every fifty percent hour in the condition of .05Mpa is that the cylinder strain drops by 1.5Mpa. If it exceeds 1.5Mpa, the stress of the strain regulator’s timetable will be decreased, if it is fewer than 1.5Mpa Maximize the stress of the pressure regulator timetable)
4) Approach: three several hours heating-three several hours heating and air flow-three several hours vacuuming-1 hour pumping-ten several hours cooling
5) Ways:
① Join the regeneration gasoline (verify the pipeline for leaks after connection: following connecting, open the major valve of the strain lowering valve to the most, If you cherished this write-up and you would like to obtain a lot more info with regards to Innovative Technologies Glovebox kindly take a look at the web-site. open the auxiliary meter to .1Mpa, convert off the most important valve, hold out fifteen minutes, if the stress of the auxiliary meter stays at .1 Mpa continues to be unchanged, indicating no air leakage)
②Set the stress of the auxiliary gauge of the strain minimizing valve to .1Mpa (the tension through air flow is about .06-.08MPa)
③ Near the cycle and analyzer
④Turn on the vacuum pump
⑤ Get started regeneration
⑥ The new system finishes at 20h (clean up prior to cleansing, h2o and oxygen index <200ppm).
6) Note: Do not cut off the power and gas during the regeneration process (especially the first 6 hours)! Some pressure reducing valves are not allowed, and the pressure needs to be adjusted appropriately to ensure continuous ventilation for 3 hours!
7) Observation: whether the regeneration gas flowmeter shows about 20L / min, otherwise adjust the pressure of the pressure reducing valve.